Know what's needed before you apply.

Whether you're developing a plotted layout, a villa community or a commercial building, PREMARK helps you check feasibility early, get your land and drawing documents in order, and coordinate the application with licensed architects, surveyors and technical professionals. Permissions are granted by HMDA or the relevant local authority.

Advisor marking locations on a site map
Approvals are granted by the authorityWe check, prepare and coordinate.
Context

Why early checks save time.

Most delays in layout and building permissions start before the application: unclear title chains, a land use that doesn't match the master plan, a road width that limits what can be built, or a missing NOC.

In and around Hyderabad, the authority that handles your file depends on where the land is: HMDA, GHMC, a municipality or DTCP. Applications are made online through the state's approval system, and the drawings must be prepared and signed by licensed technical professionals.

PREMARK helps you find these issues early, organise the documents, and keep every party moving until the authority decides.

Who does what

Clear roles, from the first conversation.

PREMARK is a consulting and coordination partner. We're clear about what we do, what qualified specialists do, and who makes the final decision.

PREMARK

Checks and coordinates

Pre-application review, document checklist, coordination with professionals and departments, and follow-ups on queries.

LICENSED PROFESSIONALS

Design, survey and sign

Licensed architects or technical personnel prepare the drawings. Surveyors prepare site plans; structural engineers certify where required.

YOU, THE LAND OWNER OR DEVELOPER

Provide and decide

Title and revenue records, ownership documents and decisions on the design and development works.

HMDA / LOCAL AUTHORITY

Decides

Scrutinises the application, inspects the site, raises shortfalls and grants (or refuses) permission.

Services

How PREMARK supports your permission requirement.

01

Pre-application feasibility

An early review of title, land use, master-plan zoning, road access and site constraints, so you know what's possible before design begins.

02

Layout permission

Coordination of the layout plan, the development works it requires (roads, open spaces, utilities) and the documents for the application.

03

Building permission

Coordination of drawings, structural certificates and supporting documents for residential and commercial building permissions.

04

Change of land use

Where the intended use differs from the master plan, support in understanding whether a change of land use is possible and coordinating the request.

05

NOCs and clearances

Mapping and coordinating the NOCs the project may need, such as fire, airport height, irrigation or environmental clearances, as applicable.

06

Shortfalls, release and occupancy

Responding to shortfall letters, coordinating the final layout release after development works, and the occupancy certificate for buildings.

Checklist

Documents typically needed before you apply.

This is a typical list, not a complete one. Requirements vary by authority, land type and project. Licensed professionals confirm the final set.
  • Title deeds with link documents covering the required period
  • Encumbrance certificate
  • Revenue records for the land, as applicable
  • Survey sketch and topographical survey plan of the site
  • Master-plan extract or land-use information for the site
  • Owner identity documents, and the development agreement or GPA, where applicable
  • Proposed layout or building drawings by a licensed architect or technical person
  • Structural stability certificate, for buildings where required
  • Applicable NOCs (fire, airport height, irrigation, environment)
  • Site photographs and access road details
Process

How we work with you.

  1. 01

    Check feasibility

    We review title, land use, zoning, access and the authority that applies to your site.

  2. 02

    Organise documents

    We give you a checklist and help collect title, revenue and survey records.

  3. 03

    Coordinate design

    Licensed architects and surveyors prepare and sign the drawings; we keep inputs and timelines on track.

  4. 04

    Apply and follow up

    We support the online application, site inspection and any shortfall responses.

  5. 05

    Release and occupancy

    We coordinate the later stages: development works, final release and occupancy certificate.

Who we support

Who this service is for

  • Land owners
  • Plotted layout and villa developers
  • Residential project developers
  • Commercial and institutional developers
  • Hospitality and warehouse projects
  • Joint-development partners
Questions

Frequently asked questions.

Related expertise

Does PREMARK get HMDA approvals?

No. Layout and building permissions are granted by HMDA or the relevant local authority after its own scrutiny and inspection. PREMARK helps you check feasibility, prepare documents and coordinate the licensed professionals and follow-ups, so your application is complete and queries are answered quickly.

Which authority handles my application: HMDA, GHMC or DTCP?

It depends on where the land is and the type of project. Sites within GHMC limits, the wider HMDA region, other municipalities and areas outside HMDA can fall under different authorities. A pre-application check confirms which one applies to your site.

Who prepares the drawings?

Drawings and site plans must be prepared and signed by licensed architects, licensed technical personnel and surveyors, with structural certificates from qualified engineers where required. PREMARK coordinates them; it does not sign drawings.

What should I check before buying land for a layout?

The title chain and encumbrances, the land use in the master plan, access road width, any restrictions such as water bodies or height limits, and whether the land is in a planned growth area. A feasibility review covers these before you commit.

Can you help after the application is submitted?

Yes. We can coordinate responses to shortfall letters, site inspection preparation, the development works required for layout release, and the occupancy certificate for buildings.

How are PREMARK's fees decided?

Fees depend on the scope: a feasibility review, full application coordination or support through to occupancy. Professional fees for architects, surveyors and engineers, and government fees and charges, are separate. Everything is agreed in writing before work starts.

Enquiry

Tell us about your requirement.

Share a few details. We'll review them and come back with the right next step, who would be involved and how fees work.

Scope and fees are agreed before any work starts.

Start with the right conversation.

Tell PREMARK what you're working on. We'll help you understand what applies and coordinate the right professionals.